Fire suppression systems for apartment, condo and townhome developments, coordinated from development permit through Schedule C sign-off.
Multi-family construction runs on a tight, layered schedule, and fire suppression has to move with the rest of the trades without becoming the thing that holds up occupancy.
EB Fire Protection works with developers and general contractors from the development permit stage through to Schedule C sign-off, keeping the sprinkler system on pace with framing, drywall and inspection milestones.
Our design and engineering team sizes the system to the building before installation starts, so the drawing that goes to the authority having jurisdiction is the system our crews actually build.